top of page

SPECIFICATIONS
LIFTOF MASS
4 200 000 KG
LIFTOFF THRUT
62.5 MN
PAYLOAD TO LEO
150 000 KG
PAYLOAD TO SSO
95 700 KG
PAYLOAD TO GTO
52 000 KG
FIRST STAGE ENGINE
M-250 (×25)
FIRST STAGE ENGINE ARCHUTECTURE
GAZ GENERATOR
FIRST STAGE ENGINE CAPACITY
2.5 MN / 315 s (sl)
SECOND STAGE ENGINE
M-250 (×3)
SECOND STAGE ENGINE ARCHITECTURE
GAZ GENERATOR
SECOND STAGE ENGINE CAPACITY
2.5 MN / 340 s (vac)
HEIGHT
108 m
DELAY BETWEEN TWO FLIGHT
48 H
REUSABILITY
FIRST STAGE / FAIRING
LAUNCH COST
120 000 000 $
RELEASE DATE
~ 2035
OVERVIEW

PAYLOAD
SECOND STAGE TANK (LCH4/LOX)
HOT STAGE RING
GRID FINS
battery / COPV
M-250 ENGINE (X25)
FAIRING
M-250 ENGINE (×3)
RCS THRUSTER
SECOND STAGE TANK (LCH4/LOX)
DEPLOYABLE HEAT SHIELD
FAIRING DIMENSION

15 m
16 m
3.75 m
4.5 m
3.75 m
3 m
3.5 m
3 m
12.5 m
12.5 m
FLIGHT TIMELINE

(1) launch, (2) ascent, (3) hot-staging, (3.1) heat shield closure / booster descent, (3.2) parachute deployment (4) fairing separation, (4.1) fairing re-entry, (4.2) parachutes deployment, (5) second stage thrust, (6) payload deployment.
DIFFERENT CONFIGURATIONS

Large fairing
Small fairing
Refueling
T-150
T-13
T-350

SPECIFICATIONS
LIFTOF MASS
10 000 000 KG
LIFTOFF THRUT
150 MN
PAYLOAD TO LEO
350 000 KG
PAYLOAD TO SSO
225 000 KG
PAYLOAD TO GTO
120 000 KG
FIRST STAGE ENGINE
M-250 (×75)
FIRST STAGE ENGINE ARCHUTECTURE
GAZ GENERATOR
FIRST STAGE ENGINE CAPACITY
2.5 MN / 315 s (sl)
SECOND STAGE ENGINE
M-250 (×3)
SECOND STAGE ENGINE ARCHITECTURE
GAZ GENERATOR
SECOND STAGE ENGINE CAPACITY
2.5 MN / 340 s (vac)
HEIGHT
123 m
DELAY BETWEEN TWO FLIGHT
72 H
REUSABILITY
FIRSTS STAGES / FAIRING
LAUNCH COST
280 000 000 $
RELEASE DATE
~ 2035
OVERVIEW

PAYLOAD
SECOND STAGE TANK (LCH4/LOX)
HOT STAGE RING
GRID FINS
COPV
M-250 ENGINE (×25)
LEFT BOOSTER
FAIRING
M-250 (×3)
RCS THRUSTER
RIGHT BOOSTER
FIRST STAGE TANK (LCH4/LOX)
Deployable shield
FAIRING DIMENSIONS

15 m
16 m
3.75 m
4.5 m
3.75 m
3 m
3.5 m
3 m
12.5 m
12.5 m
FLIGHT TIMELINE

(1) launch, (2) ascent, (3) sides boosters separation, (3.1) sides boosters descent, (3.2) sides boosters parachutes deployment,(4) main booster thrust, (5) hot staging, (5.1) main booster descent, (5.2) main booster parachute deployment, (6) fairing separation, (6.1) fairing descent, (6.2) fairing parachutes deployment, (7) second stage thrust, (8) payload deployment.
DIFFERENT CONFIGURATIONS

Large fairing
small fairing
refueling
bottom of page